• ❤ Donate Now
  • SPONSOR
  • FUNDERS
  • Contributors
  • About
    • Main
    • LATEST POSTS
    • News
      • News Topics
        • Agriculture
        • Climate change
        • Colorado River
        • Delta Conveyance Project
        • Ecosystems
        • Fish and wildlife
        • Groundwater News
        • Hydrology
        • Planning and management
        • Policy and regulation
        • Science
        • Water project operations
        • Water quality
        • Water rights and water law
        • Water supply augmentation
        • Wildfires and watersheds
        • All news
      • News types
        • All News
        • Notebook News and Features
        • Featured articles
        • Best of the Notebook
        • The Water Shelf
        • Daily Digest
        • Weekly Digest
        • Commentary
        • Fact Sheets/Tools/Info
        • Podcasts and webinars
        • Reports
        • Research articles
        • ANNOUNCEMENTS
      • Hot Topics
        • Data centers
        • El Nino/La Nina
        • Groundwater recharge
      • Explore
        • Search archives
        • Explainers
        • Directory
        • Glossary
        • Subscribe
        • Donate
        • Sponsor
    • EXPLAINERS
      • Where does California’s water come from?
      • California’s groundwater
      • Sustainable Groundwater Management Act
      • Delta Conveyance Project
      • Bay Delta Water Quality Control Plan (Bay Delta Plan)
      • VIEW ALL EXPLAINERS
    • Calendar
    • WATER SHELF
    Home

    design-bid-build

    Maven February 12, 2014
    « Back to Glossary Index

    Design-bid-build is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.

    More from Wikipedia by clicking here.

    Print Friendly, PDF & Email
    Related Articles:
    • DAILY DIGEST, 10/22: CA water rights management leaps forward with new reporting system; Giving everyone a say in the Delta’s future; NorCal reservoir has pioneered a way to store more water; Shutdown brings more BASE jumpers and drones to Yosemite skies; and more …
    • NOTEBOOK FEATURE: DWR presents Delta Conveyance Project cost estimate and benefit cost analysis to Metropolitan Committee
    • METROPOLITAN SPECIAL COMMITTEE ON THE BAY-DELTA: Project implementation considerations for California Water Fix; Dr. Jacob Katz on managing floodplain productivity for multiple benefits
    • BDCP Infrastructure Review, part 2: San Diego County Water Authority staff review the engineering report for the BDCP
    • Assembly oversight hearing on the funding structure and economic impacts of the Bay Delta Conservation Plan (part 2): Anton Favorini-Csorba and Dr. Jeff Michael on funding the BDCP
    « Back to Glossary Index
    Maven
    Publisher
    Chris Austin, otherwise known as Maven, has been publishing Maven's Notebook since 2013 and has been aggregating California water news since 2007.
    © 2013-2024 Maven's Notebook, et al. All Rights Reserved.
    Type to search or hit ESC to close
    See all results